| 번호 | 프로젝트명 | 발주처 | Scope of Work | 공사기간 | 조회 |
|---|---|---|---|---|---|
| 15 | HCP No.2 BTX Flare & PSV Project | 현대중공업 |
- Process Simulation - Flare Load Analyzing - Network Calculation - Flare System Purchasing |
2011.04 ~ 2011.07 | 215 |
| 14 | Flare System Capacity Assessment Procurement Project | 삼성 BP 케미칼 |
- Flare Load Analyzing - Network Calculation |
2011.03 ~ 2011.07 | 204 |
| 13 | Polymer Pilot Plant Flare | 삼성토탈석유화학 |
- Flare Load Analyzing - Network Calculation - PSV Sizing |
2011.03 ~ 2011.04 | 201 |
| 12 | YERP PSV Load Calculation | SK 건설 |
- Flare Load Reanalyzing - Network Calculation - PSV Sizing |
2011.02 ~ 2011.07 | 193 |
| 11 | No.2 FCC Flare System Study Project | SK 건설 |
- PSV Load Evaluation - Flare Load Analyzing - Flare Header Network Calculation |
2010.10 ~ 2010.11 | 211 |
| 10 | Synthetic Rubber Plant Basic Design and Flare Load Analysis Project | LG 케미칼 |
- Flare Load Analyzing - Flare Header Network Calculation |
2009.08 ~ 2010.12 | 263 |
| 9 | IGD Flare Gas Project | 현대중공업 |
- Flare System Basic Design (Network Calculation, etc.) - PSV Sizing |
2009.11 ~ 2010.09 | 214 |
| 8 | LG Chemical Flare | LG 케미칼 |
- Process Simulation - Flare Load Reanalyzing - Network Calculation - Trouble shooting for existing Flare System |
2008.02 ~ 2008.05 / 2009.0. ~ 2009.05 (2 times) | 190 |
| 7 | KTIA Flare (USA) | Crown Asphalt Ridge, L.L.C. USA |
- Flare Load Analyzing - Network Calculation |
2009.07 ~ 2009.12 | 192 |
| 6 | GS Caltex No.4 CDU Revamping | GS 건설 |
- Unit Load recalculation - Network Calculation |
2008.01 ~ 2009.05 | 206 |